CDM Co‚Äźordination

The introduction of the Construction (Design & Management) Regulations in 1994 brought about the legal requirement for Planning Supervision on all applicable construction projects.

The CDM Regulations were substantially revised on 6 April 2015. These revisions saw the role of CDM Co-ordinator transferred to a Principal Designer and Principal Contractor. The Principal Designer (PD) is responsible for the pre-construction phase whilst the Principal Contractor is responsible for the construction phase.

RDJW Architects Limited have been carrying out the role of Principal Designer on a large range of projects over the past years since the introduction of the regulations.

Our experience allows us to assist you in complying with your legal obligations in a manner which is proportionate to the nature, scale and level of health and safety risks involved in the project.

Back to top
RDJW Architects Limited
Unit 12 Gleneagles Court
Brighton Road
Crawley
West Sussex
RH10 6AD